PSIP PROTOCOL
  • Look Up a Contractor
  • Education
    • The Standard
      • What Is a Documented Pour
      • The PSIP Standard
      • The Six Pillars
      • PSIP Flatwork (Concrete)
      • PSIP Aquatic (Pools)
    • The Science
      • The Definitions
      • The Problem
      • Concrete Cancer (ASR)
      • How to Prevent ASR
      • The Fly Ash Supply
      • Why Texas Pools Are Failing
      • Research Library
    • Choosing a Contractor
      • What Best Concrete Contractor Means
      • Why Is My New Concrete Cracking
      • How to Verify Contractor Work
      • Is Fly Ash Good or Bad
      • What Is Type 1L Cement
      • How Long Should Concrete Last
    • Choosing a Pool Builder
      • What Best Pool Builder Means
      • Why Is My Pool Plaster Failing
      • Gunite Versus Shotcrete
      • How Long Should a Pool Shell Last
  • The Crisis by State
    • Texas
    • Florida
    • Tennessee
    • Georgia
    • North Carolina
  • The Institution
    • The Founder
    • Independence Standard
    • Technical Advisory Council
  • Where We Certify
Get Certified
PSIP Protocol · The Name and the Seal

USING THE PSIP NAME.

Effective date: October 18, 2026

For certified contractors and anyone who builds their website, ads or marketing.

For certified contractors

  • You may say PSIP Certified only while your certification is current. Check your record page.
  • PSIP certifies the record of your work, not the concrete. Say it that way.
  • Use the seal only on work PSIP recorded. Do not redraw it or recolor it outside the approved files. It carries a small TM, never an R.
  • Never say or suggest PSIP licensed you, insured you, approved you or guaranteed your work. Your license is yours.
  • Do not promise results, rankings or leads from PSIP.
  • Link to your record page wherever you use the name, so a homeowner can check it herself.
  • Claiming certification you do not hold, or using the seal on work PSIP never recorded, is grounds for revocation. You answer for what your agency writes.
  • Three strikes. First: a written warning and 10 days to fix it. Second: a written warning, 10 days to fix it, and a $100 fine. Third: review, where revocation is the expected result. Strikes never reset, and revocation is permanent.
  • Notice goes to the email on file, and the 10 days start the day it is sent. Keep your email current.
  • Send this page to whoever builds your website and marketing. "My agency did it" is heard once, and only with proof.

For agencies and marketers

The PSIP name and seal are trademarks of Performance Structural Standards Group. Only a contractor who is currently certified may use them, under a license that ends the day his certification ends. Nobody else is licensed to use them, agencies included.

If you market a contractor as PSIP certified when he is not, or put the seal on work PSIP never recorded, you are misusing PSSG's mark. You are also putting your client at risk of losing his certification for good. PSSG may act directly against anyone who misuses the mark, including the agency that published it.

Before you use the PSIP name, check your client's record page. If it says not currently certified, take the name down.

PSIP PROTOCOL

The Performance Structural Integrity Protocol is the documentation layer that records what was placed and done at the pour on residential and pool construction, in a form that survives. Built on published ACI documents. Documented pour by pour. Permanent record.

Homeowners
  • Look Up a Contractor
  • What Best Concrete Contractor Means
  • Why Is My New Concrete Cracking
  • How to Verify Contractor Work
  • Is Fly Ash Good or Bad
  • What Is Type 1L Cement
  • How Long Should Concrete Last
  • What Best Pool Builder Means
  • Why Is My Pool Plaster Failing
  • Gunite Versus Shotcrete
  • How Long Should a Pool Shell Last
  • Texas
  • Florida
  • Tennessee
  • Georgia
  • North Carolina
  • Aquatic (Pools)
Contractors
  • Get Certified
  • Training Hub
The Science
  • The Definitions
  • What Is a Documented Pour
  • The Problem
  • Concrete Cancer (ASR)
  • How to Prevent ASR
  • The Fly Ash Supply
  • Research Library
The Institution
  • The Founder
  • Independence Standard
  • Technical Advisory Council
Privacy Policy · Terms of Service · Billing & Refund Policy · Cookie Notice · Accessibility · Using the PSIP Name
Contact  ·  info@psipprotocol.com
The Performance Structural Integrity Protocol is operated by Performance Structural Standards Group, Inc.
© 2026 Performance Structural Standards Group, Inc. All rights reserved.

No material supplier can pay for a say in PSIP: not in the standard, not in a record, not in a certification. The protocol certifies. The record documents. The dataset is being built. References to specific products in PSIP content are field observations by the author, not protocol endorsements.

PSIP records the work and certifies that it was recorded. The contractor is responsible for local building codes, permits and licensing. PSIP certification is not an inspection, a code approval or a warranty.