PSIP Doctrine · Structural Independence

THE INDEPENDENCE STANDARD.

The PSIP Independence Standard is the published rule that the Performance Structural Integrity Protocol is structurally independent of every cement company, every admixture manufacturer, every ready-mix producer, and every aggregate supplier. PSIP is the documentation and scoring layer that makes compliance with ASTM concrete standards verifiable on residential and pool construction. It does not accept money from material companies. The independence is not a value statement. It is a structural rule, and it is the precondition for the score meaning anything at all.

Published: 2026. Last updated: August 2026.
Publisher: Performance Structural Standards Group, Inc.
Cite as: PSIP, "The PSIP Independence Standard," psipprotocol.com, 2026.
Document version: v2.0.

What happened in Texas, and why it matters here.

In late 2017 and early 2018, Luminant announced and carried out the closure of three of its Texas coal fueled power plants. Monticello in Titus County. Big Brown in Freestone County. Sandow in Milam County.

Those plants did not only generate electricity. They generated fly ash. Class F fly ash, the low calcium, high silica byproduct of bituminous coal combustion, had been the primary supplementary cementitious material protecting Texas concrete against alkali silica reaction for decades. When the plants closed, the regional supply of that material contracted sharply.

A ready-mix producer facing that contraction has two paths. Reformulate the mix with a verified alternative supplementary cementitious material, and absorb the cost and the testing burden. Or place concrete without it.

Here is the part that matters, and it is not about anyone's bad faith. There was no requirement anywhere in the chain to document that the chemistry had changed. Not on the batch ticket. Not in the contract. Not at the pour. The pool builder purchasing the material had no mechanism to verify what was in it. The homeowner signing the contract had no mechanism to know what to ask. The pour proceeded and the paperwork looked the same as it had the year before.

Concrete does not report its own chemistry. It reports it later, when it fails. In pool shells across Central Texas, alkali silica reaction did exactly that. ASR is an internal expansive reaction, sometimes called concrete cancer, and it works from the inside of the shell outward over years. The shells looked correct at completion. Families swam in them. The failures surfaced later, and the cracking visible on the surface was the symptom, not the event.

Reporting in Texas Monthly documented the pattern. Insurance carriers are now contesting in federal court whether ASR damage is covered as a construction defect at all, which means the homeowner who bought a pool in good faith may have no backstop.

None of that was a failure of the standards. It was the absence of a layer that documents whether the standards were followed, at the pour, on the day, in a form that survives.

Why did the standards not prevent it?

ASTM Committee C09 was established in 1914. For more than a century it has defined how concrete is specified, mixed, sampled, tested, and accepted in the United States. The standards are correct. They are the technical foundation of competent concrete practice in this country.

ASTM does not enforce standards in the field, and was never designed to. The committee writes the rules. It does not document whether the rules were followed on the slab in front of a specific house on the day it was poured.

The American Concrete Institute publishes ACI 318, the structural design code, along with the placement, curing, hot and cold weather, and shotcrete specifications. ACI also operates individual certifications, including Concrete Field Testing Technician, Concrete Construction Special Inspector, and Shotcrete Nozzleman. Those certifications document that a person has demonstrated knowledge of a procedure. They do not document the work that person performed on any particular pour. The International Concrete Repair Institute covers repair and rehabilitation on the same individual model.

The gap is structural, and it is nobody's error. The standards exist. The certifications exist. What did not exist is the layer that carries the standards from the page to the slab to a permanent record.

In residential and pool construction, that gap is where the cost lands. When a homeowner sues five years after a pour, the contractor who can produce a documented record of what was actually placed is in a very different position from the contractor who cannot, regardless of whether the work was good.

What does PSIP add that did not exist?

The framework was not invented. It was assembled from what the standards and the science already specify. ASTM C09 on mixing and testing. ACI 318 on design. ACI 304R, 305, 306, 308R and 506.2 on placement, hot and cold weather concreting, curing, and shotcrete. ASTM C595 on blended cements. ASTM C1778 on aggregate reactivity and prevention. The standards are dense, technical, and complete.

What they do not do is travel with the slab. PSIP adds three layers on top of them. Continuous documentation across the cure window. Neutral scoring, blind to brand. And a permanent record that travels with the slab and is available to the homeowner, the contractor, the engineer of record, the insurance carrier, and, when it comes to it, a court.

The technical content is not novel. The institutional layer is.

What does structural independence actually mean?

The institutional model PSIP is built against is Underwriters Laboratories. The reference is structural, not aspirational. UL emerged in 1894 to answer an analogous gap in electrical safety. Manufacturers built products, standards bodies wrote codes, and insurance carriers needed independent verification that the products as built complied. The credibility of that mark rests on four commitments. PSIP applies the same four.

1. Independent governance

The PSIP Technical Advisory Council, a nine seat body, will hold exclusive authority over every technical decision in the protocol once it is seated. The Protocol Creator appoints four founding seats one time only. The remaining five are filled by open nomination from the concrete community, under criteria the Council itself sets. After seating, the Protocol Creator does not vote, appoint, remove, or override. No seat is currently filled. The full specification is on the Technical Advisory Council page.

2. No financial relationship with the entities being scored

PSIP does not accept money from material companies. Not sponsorship. Not advisory fees. Not endorsement. Not research partnership. Not in any other form. Cement manufacturers, admixture suppliers, ready-mix producers, aggregate suppliers, and shotcrete equipment manufacturers are excluded by structural rule. A material company that wants its product tested funds independent testing at a university, and that result stands on its own. PSIP scores the work. PSIP does not score the materials.

3. Blind technical review

Scoring proceeds without knowledge of the contractor brand, the plant brand, or the admixture brand at the time of scoring. The tier is assigned by score. The label is applied only after the tier is locked. A contractor's marketing does not move the score. The work moves the score.

4. Openly published standards

The technical framework, the scoring methodology, this Standard, and the Technical Advisory Council charter are published openly. No email gate. No paywall. Citation by third parties is structural. A standard that cannot be read by the contractors who apply it, the homeowners who rely on it, and the carriers who reference it is not functioning as a standard.

PSIP scores. PSIP never recommends.

The doctrinal anchor of this Standard is one rule. PSIP scores work. PSIP does not recommend products.

A cement company can fund independent testing of its product at a university laboratory, and that result stands on its own in the technical literature. PSIP does not score the cement. PSIP scores the pour in which the cement is placed.

An admixture manufacturer can fund the same testing. PSIP does not score the admixture. PSIP scores the pour in which it is applied.

A ready-mix producer can deliver Type I, Type II, Type 1L Portland limestone cement, blended cements, or any mix design the contractor specified and accepted on the batch ticket. PSIP documents the batch ticket and scores the pour. The producer's relationship with PSIP, if any, is the same as the contractor's.

A company can buy a test. A company cannot buy a score.

The same rule governs the directory. Every certified contractor appears in it, including contractors who pay nothing beyond certification. Results are sorted by score, proximity, and relevance. A paid listing produces a larger and more detailed card in the same position that listing would otherwise hold. No paid tier moves a contractor above an equally scored contractor, in any view, at any time. The certification mark a contractor displays shows certified status and certificate number. It never shows what that contractor pays.

How is PSIP funded, and who is excluded?

The protocol is funded by contractor and pool builder certification, and by future licensing of the aggregated dataset. Material company money is structurally excluded.

Certification. Founding class admissions and ongoing renewals fund operations.

Dataset licensing. As documented pour records accumulate, the aggregated and de-identified dataset becomes a research asset. Licensing is available to insurance carriers for actuarial and underwriting work, to ready-mix quality control departments for plant level monitoring, to academic researchers, and to independent forensic and standards development researchers.

Material company research departments are not eligible for dataset licensing. The exclusion is a deliberate extension of the independence rule. PSIP does not accept material company money in any form, including through licensing fees, regardless of any internal firewall a material company proposes between its commercial and research operations. The rule is structural. It does not bend.

The homeowner directory is free. Homeowners do not pay to search it, do not pay to be matched, and do not pay for placement on a waiting list. The directory exists to serve the people who carry the cost when residential and pool concrete fails.

Who governs this standard, and who governs it next?

Today, Performance Structural Standards Group controls the protocol. That is the honest answer and it is the reason the Technical Advisory Council exists. Every change to a scoring criterion, a weight, or the passing threshold is published with the date it was made, so the record is available to the Council when it is seated and to anyone else in the meantime.

The architecture is designed to outlast its founder. The framework that became PSIP was built by a contractor with three decades in construction and building maintenance, working from outside the industry's trained assumptions. That position was not a credential. It was a vantage point. The gap was visible because the assumptions had not closed over it.

Once the founding cohort of the Council is seated, authority over the standard transfers. An institutional standard that depends on its founder is not an institutional standard. It is a brand. PSIP is built to be a standard.

Common questions

What people ask about PSIP independence.

What is the PSIP Independence Standard?

It is the published rule that PSIP is structurally independent of every cement company, admixture manufacturer, ready-mix producer, and aggregate supplier. PSIP does not accept money from material companies in any form. The independence is not a value statement. It is a structural rule.

Does PSIP recommend contractors or products?

No. PSIP scores. PSIP never recommends. Nothing PSIP publishes endorses, ranks, or recommends any contractor, product, or material brand. Directory results are sorted by score, proximity, and relevance.

Can a company pay for a better score?

No. A company can buy a test. A company cannot buy a score. Scoring proceeds without knowledge of the contractor brand, the plant brand, or the admixture brand. The tier is assigned by score and the label is applied only after the tier is locked.

Does a paid directory listing move a contractor up the results?

No. A paid listing produces a larger and more detailed card in the same position that listing would otherwise hold. No paid tier moves a contractor above an equally scored contractor, in any view, at any time. Every certified contractor appears in the directory, including those who pay nothing beyond certification.

Does PSIP replace ASTM or ACI?

No. ASTM Committee C09 writes the material and test method standards. ACI publishes the structural code and the placement, curing, and shotcrete specifications. PSIP does not duplicate, replace, or reinterpret any of them. PSIP documents and scores whether the work followed them.

Who governs the PSIP standard?

The PSIP Technical Advisory Council, a nine seat independent body, will hold governing authority once seated. No seat is currently filled. Until it is seated, Performance Structural Standards Group controls the standard, and every change to the scoring criteria, the weights, or the passing threshold is published with the date it was made.

Who is excluded from funding PSIP?

Cement manufacturers, admixture suppliers, ready-mix producers, aggregate suppliers, and shotcrete equipment manufacturers are excluded from financial relationships with PSIP by structural rule. Material company research departments are also excluded from dataset licensing, regardless of any internal firewall proposed.

The founder's role ends where the institution begins.