The PSIP Independence Standard is the published rule that no cement company, admixture manufacturer, ready-mix producer or aggregate supplier can pay for a say in the Performance Structural Integrity Protocol. PSIP is the documentation layer that records what was placed and done at the pour on residential and pool construction, in a form that survives. No material company can buy a change to the standard, a record, a certification or the directory. The independence is not a value statement. It is a structural rule, and it is the precondition for the record meaning anything at all.

Published: 2026. Last updated: September 2026.
Publisher: Performance Structural Standards Group, Inc.
Cite as: PSIP, "The PSIP Independence Standard," psipprotocol.com, 2026.
Document version: v2.1.

What happened in Texas, and why it matters here.

In 2018, three Texas coal fueled power plants retired: Monticello in Titus County, Big Brown in Freestone County and Sandow in Milam County, per EIA generator data.

Those plants did not only generate electricity. They generated fly ash. Class F fly ash, the low calcium, high silica byproduct of bituminous coal combustion, had been the primary supplementary cementitious material protecting Texas concrete against alkali silica reaction for decades. When the plants closed, the regional supply of that material shrank sharply.

A ready-mix producer facing that smaller supply has two paths. Reformulate the mix with a verified alternative supplementary cementitious material, and absorb the cost and the testing burden. Or place concrete without it.

Here is the part that matters, and it is not about anyone's bad faith. There was no requirement anywhere in the chain to document that the chemistry had changed. Not on the batch ticket. Not in the contract. Not at the pour. The pool builder purchasing the material had no mechanism to verify what was in it. The homeowner signing the contract had no mechanism to know what to ask. The pour proceeded and the paperwork looked the same as it had the year before.

Concrete does not report its own chemistry. It reports it later, when it fails. In pool shells across Central Texas, alkali silica reaction has been reported doing exactly that. ASR is an internal expansive reaction, sometimes called concrete cancer, and it works from the inside of the shell outward over years. The shells looked correct at completion. Families swam in them. The failures surfaced later, and the cracking visible on the surface was the symptom, not the event.

None of that was a failure of the standards. It was the absence of a layer that documents whether the standards were followed, at the pour, on the day, in a form that survives.

Why did the standards not prevent it?

ASTM Committee C09 was established in 1914. For more than a century it has defined how concrete is specified, mixed, sampled, tested, and accepted in the United States. The standards are correct. They are the technical foundation of competent concrete practice in this country.

ASTM does not enforce standards in the field, and was never designed to. The committee writes the rules. It does not document whether the rules were followed on the slab in front of a specific house on the day it was poured.

The American Concrete Institute publishes ACI 318, the structural design code, along with the placement, curing, hot and cold weather, and shotcrete specifications.

The gap is structural, and it is nobody's error. The standards exist. What did not exist is the layer that carries the standards from the page to the slab to a permanent record.

In residential and pool construction, that gap is where the cost lands. When a homeowner sues five years after a pour, the contractor who can produce a documented record of what was actually placed is in a very different position from the contractor who cannot, regardless of whether the work was good.

What does PSIP add that did not exist?

The framework was not invented. It was assembled from what the standards and the science already specify. ASTM Committee C09 on mixing and testing. ACI 318 on design. ACI PRC-304-00, ACI PRC-305-20, ACI PRC-306-16, ACI PRC-308-26 and ACI SPEC-506.2-13(18) on placement, hot and cold weather concreting, curing, and shotcrete. ASTM C595/C595M on blended cements. ASTM C1778 on aggregate reactivity and prevention. The standards are dense, technical, and complete.

What they do not do is travel with the slab. PSIP adds two layers on top of them. Documentation across the stages of the job. And a permanent record that travels with the slab and is available to the homeowner, the contractor, the engineer of record, the insurance carrier, and, when it comes to it, a court.

The technical content is not novel. The institutional layer is.

What does structural independence actually mean?

PSIP holds itself to four commitments.

1. Independent governance

The PSIP Technical Advisory Council, a nine seat body, will hold exclusive authority over every technical decision in the protocol once it is seated. The Protocol Creator appoints four founding seats one time only. The remaining five are filled by open nomination from the concrete community, under criteria the Council itself sets. After seating, the Protocol Creator does not vote, appoint, remove, or override. No seat is currently filled. The full specification is on the Technical Advisory Council page.

2. No material company can buy a say

No cement manufacturer, admixture supplier, ready-mix producer, aggregate supplier or shotcrete equipment manufacturer can pay PSIP for sponsorship, endorsement, advisory work, placement, or any say in the standard, a record, a certification or the directory. A material company that wants its product tested funds independent testing at a university, and that result stands on its own. Whether material companies should ever help fund field testing and share in the field data is an open question, set out below, for the Technical Advisory Council to decide. No material company pays PSIP today. PSIP certifies the record of the work. PSIP does not rate, rank or recommend any material.

3. Brand neutral records

A PSIP record holds what the contractor documented on the job, including the batch ticket photograph. PSIP does not evaluate any brand in it. No brand and no contractor's marketing changes what a record says.

4. Openly published standards

This Standard and the Technical Advisory Council charter are published openly. The certification standards list is published the same way. No email gate. No paywall. Citation by third parties is structural. A standard that cannot be read by the contractors who apply it, the homeowners who rely on it, and the carriers who reference it is not functioning as a standard.

PSIP records. PSIP never recommends.

The doctrinal anchor of this Standard is one rule. PSIP certifies the record, not the concrete. PSIP does not recommend products.

A cement company can fund independent testing of its product at a university laboratory, and that result stands on its own in the technical literature. PSIP does not evaluate the cement. PSIP records the pour in which the cement is placed.

An admixture manufacturer can fund the same testing. PSIP does not evaluate the admixture. PSIP records the pour in which it is applied.

A ready-mix producer can deliver Type I, Type II, Type 1L Portland limestone cement, blended cements, or any mix design the contractor specified and accepted on the batch ticket. The batch ticket is photographed as part of the record, and PSIP certifies the record of the pour. The producer's relationship with PSIP, if any, is the same as the contractor's.

A company can pay for a test. No company can pay to change what a PSIP record says.

The same rule will govern the directory, which is not open yet. When it opens, every certified contractor will appear in it, including contractors who pay nothing beyond certification. Results will be listed by company name by default, and no payment changes the order. A paid listing will produce a larger and more detailed card in the same position that listing would otherwise hold. No paid tier will move a contractor above another, in any view, at any time. The certification mark a contractor displays shows certified status and certificate number. It never shows what that contractor pays.

How is PSIP funded, and what can money never buy?

Today the protocol is funded by contractor and pool builder certification. Licensing of the aggregated field data is planned. No material company pays PSIP today, and none can ever pay for a say in the standard, a record or a certification.

Certification. Certification fees and renewals fund operations.

Dataset licensing, planned. As documented pour records accumulate, the aggregated and de-identified dataset becomes a research asset. It is intended for insurance carriers for actuarial and underwriting work, academic researchers, and independent forensic and standards development researchers. Whether material companies share in it is the open question below.

An open question for the whole industry. The founder's view is that concrete gets better when every part of the industry learns from the same field data. Give admixture manufacturers real field data on how their products behave in summer heat and in winter cold, and they can adjust and improve them. Give ready-mix producers the same data, and they can see what a mix needs from season to season and dial it in. That is American ingenuity at work, the same ingenuity that has answered every time this country needed it. What it needs is the evidence. Testing concrete from early documented pours costs money, and one proposal is that the companies that gain from the data help fund it. PSIP is not saying yes and is not saying no. The question goes to the Technical Advisory Council once it is seated, and it is checked against the rules that govern certification bodies. Two tests decide it: does it make a better pour for the homeowner, and does the industry gain?

What PSIP will propose to the Council. Every company that takes part pays the same published terms and receives the same data on the same day. No company chooses what is tested, how it is tested or what is published. No company uses the PSIP name or data to sell a product. Every company that takes part is named publicly. No money from material companies moves until the Council has set the terms. None of this operates today.

The homeowner directory is free. Homeowners do not pay to search it, do not pay to be matched, and do not pay for placement on a waiting list. The directory exists to serve the people who carry the cost when residential and pool concrete fails.

Who governs this standard, and who governs it next?

Today, Performance Structural Standards Group controls the protocol. That is the honest answer and it is the reason the Technical Advisory Council exists. Every change to the certification standards list, the exam, or the passing mark is published with the date it was made, starting with the standards list published October 2, 2026, so the record is available to the Council when it is seated and to anyone else in the meantime.

The architecture is designed to outlast its founder. The framework that became PSIP was built by a contractor with three decades in construction and building maintenance, working from outside the industry's trained assumptions. That position was not a credential. It was a vantage point. The gap was visible because the assumptions had not closed over it.

Once the founding cohort of the Council is seated, authority over the standard transfers. An institutional standard that depends on its founder is not an institutional standard. It is a brand. PSIP is built to be a standard.

Common questions

What people ask about PSIP independence.

What is the PSIP Independence Standard?

It is the published rule that no cement company, admixture manufacturer, ready-mix producer or aggregate supplier can pay for a say in the PSIP standard, a record, a certification or the directory. The independence is not a value statement. It is a structural rule.

Does PSIP recommend contractors or products?

No. PSIP records. PSIP never recommends. Nothing PSIP publishes endorses, ranks, or recommends any contractor, product, or material brand. The directory is not open yet. When it opens, results will be listed by company name by default.

Can a company pay to change a PSIP record?

No. A company can pay for a test. No company can pay to change what a PSIP record says. A record holds what the contractor documented on the job, and PSIP does not evaluate the brands in it.

Does a paid directory listing move a contractor up the results?

No. When the directory opens, a paid listing will produce a larger and more detailed card in the same position that listing would otherwise hold. No paid tier will move a contractor above another, in any view, at any time. Every certified contractor will appear in the directory, including those who pay nothing beyond certification.

Does PSIP replace ASTM or ACI?

No. ASTM Committee C09 writes the material and test method standards. ACI publishes the structural code and the placement, curing, and shotcrete specifications. PSIP does not duplicate, replace, or reinterpret any of them. PSIP records what was done on the job. It does not judge whether the work met them.

Who governs the PSIP standard?

The PSIP Technical Advisory Council, a nine seat independent body, will hold governing authority once seated. No seat is currently filled. Until it is seated, Performance Structural Standards Group controls the standard, and every change to the certification standards list, the exam, or the passing mark is published with the date it was made, starting with the standards list published October 2, 2026.

Can a material company pay PSIP?

Not today, and never for a say. No cement manufacturer, admixture supplier, ready-mix producer, aggregate supplier or shotcrete equipment manufacturer can pay for sponsorship, endorsement, advisory work, placement, or any say in the standard, a record or a certification. Whether material companies should help fund field testing and share in the field data is an open question for the Technical Advisory Council, and no money from material companies moves until the Council has set the terms.